Bus MaintenancePit Modifications
  • Jonathans Pictures 151.jpg
  • Jonathans Pictures 155.jpg
  • Jonathans Pictures 156.jpg
  • Jonathans Pictures 158.jpg

Enlarge Image

Bus Maintenance Pit Modifications


Details:

Client Name:

Contract Administrator & Designer:
URS
Beechill House
Beechill Road
Belfast
BT8 6RP 

Project Details:

Client:  Translink

Project Details:
The works took place within 18 Bus Engineering Workshops across Northern Ireland.  The scope of the works involved the full breaking out and removal of the existing reinforced concrete pits, completing reduced dig, drive mini piles, build permanent formwork. place Gracie water proof tanking, tie new re-bar in place, erect formwork, pour concrete pit floors then followed by walls and workshop floors.  New compressed air lines and lighting fitted in each pit.  Completed with new painting throughout.  The project was completed out of hours and at weekends to create minimal distruption to the workers within each workshop.

Duration of contract: 22 weeks

Location: 18 Bus Engineering Workshops in NI