Newtownards Engineering Workshop Bus Yard Refurbishment

26 August 2016

Over a three week period we refurbished the existing bus yard, placed 300m road kerbs, installed 200m of electrical ducting, replaced all site drainage, installed new fuel interceptor, removed existing surfacing and placed 3000sqm new SMA fuel resistant surfacing and road base.  Our site team worked well to meet all the client deadlines and handed over the project on time. 

 