Ballymena Credit Union refurbishment

Ballymena Credit union gets a renovation by Cleary Contracting Ltd

Client Name: Ballymena Credit Union Project Details: Client:  Ballymena Credit Union We completed the works whilst the Credit Union remained open for business.  We initially formed a new opening onto the street and constructed a temporary banking screen.  We then removed all the existing fittings and fixtures within the existing banking hall.  The scope of the works… Continue reading Ballymena Credit Union refurbishment

Belfast welcome new transport “hub” with the help of Cleary Contracting.

Belfast Transport Hub - Adelaide all structural work carried out by Cleary Contracting

The new Permanent Way Building was constructed on the site of the former Guinness Factory in Belfast.  Due to the ground conditions it was required to install 225 dia driven piles to depths of 16-20m over the foot print of the building.  The build itself was constructed by concrete ground beams, pre-cast concrete slabs, structural… Continue reading Belfast welcome new transport “hub” with the help of Cleary Contracting.

North West Regional College Refurbishment & Fit Out

NWRC Strand Road gets a revamp thanks to Cleary Contracting

Client Name: North West Regional College Estates TeamProject Details: The works within North West Regional College Tower Building Derry/Londonderry was phased over 12 weeks; with five weeks for Level II works 600m2 and seven weeks for Level I works 950m2. On each floor we demolished all non-load bearing walls within the concrete framed and floored building. Installed new… Continue reading North West Regional College Refurbishment & Fit Out

Lowe Memorial Church Finaghy refurbishment

Lowe Memorial Church gets renovated by Cleary Contracting

Client Name: Lowe Memorial Committee Church Project Details: The project at Lowe Memorial Church Finaghy Belfast involved creating a new Church entrance, welcome area, informal café church, new link corridor to rear of church and refurbishment of prayer chapel. The site was very restrictive in terms of access to one single point and required sizing correct… Continue reading Lowe Memorial Church Finaghy refurbishment

22 railways from Larne to Belfast upgraded

22 railway lines through Belfast – Larne line and Belfast – Derry line rail network.

Client Name: Translink Project Details:This project was similar to the works undertaken in Package l. The works involved managing numerous live sites with day and night working on the Belfast – Larne line and Belfast – Derry line rail network. Location:22 railway stations on the Belfast – Larne line and Belfast – Derry line

Major renovations for NI’s leading transport Hub.

Belfast Central Transport Hub undergos major renovations with the help of Cleary Contracting

Building attractive and high-quality passenger facilities played an important role in increasing the use of public transport, and that is exactly what Cleary Contracting has achieved on completion of this renovation. Over 2.6 million passengers used the station last year, and this work will provide a new modern, more welcoming frontage to replace the current… Continue reading Major renovations for NI’s leading transport Hub.