New storage facility for Translink vehicle parts.

Block built translink storage facility, by Cleary Contracting

Client Name: TranslinkProject Details: Design and Build new storage facility for vehicle parts.  Constructed on piled foundations, ground beams, RC floors with steel portal frame.  Wall & roof cladding with fall arrest system.  Facing block throughout with internal racking installed to clients specification and needs. Duration of contract: 16 weeks. Location: Pennyburn Engineering Workshop, Derry/Londonderry. Architect: Design 2 Architects.